Nad DP 4 Service Manual

This is the 8 pages manual for Nad DP 4 Service Manual.
Read or download the pdf for free. If you want to contribute, please mail your pdfs to info@audioservicemanuals.com.

Page: 1 / 8
left right
Nad DP 4 Service Manual

Extracted text from Nad DP 4 Service Manual (Ocr-read)


Page 1

4-1 DECK MECHANISM PARTS LOCATION Starting No. 1 1, 2 1, 2, 3 1, 2, 3, 4 1 1, 6 1, 2, 6 1, 2, 6, 8 1, 2, 6, 8, 9 1, 2, 7 1, 2, 7 1, 2 1, 2 ,13 1, 2, 13, 14 1, 2, 7, 12, 13, 14 1, 2, 13 1, 2, 7, 12, 13, 14, 15, 16, 17 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Holder Clamp Clamp Assembly Disc Plate Clamp Magnet Clamp Clamp Upper Tray Disc Base Assembly Sled Gear Assembly Feed Gear Middle Gear Assembly Rack Rubber Rear Frame Assembly Up/Down Belt Loading Gear Pulley Gear Loading Guide Up/Down PWB Assembly Loading Base Main 2 Screws, 2 Locking Tabs 4 Screws, 1 Connector 1 Locking Tabs 1 Screw 1 Screw 1 Locking Tab 1 Locking Tab 1 Locking Tab 1 Hook 2Screw 2 Locking Tabs4-1 4-1 4-1 4-1 4-1 4-2 4-3 4-3 4-3 4-3 4-3 4-4 4-4 4-4 4-4 4-4 4-4 4-4 Bottom Bottom Procedure PartsFixing TypeFig- ure Disass embly Note When reassembling, perform the procedure in reverse order. The ÒBottomÓ on Disassembly column of above Table indicates the part should be disassembled at the Bottom side. ¥ Top View (Without Tray) ¥ Bottom View ¥ Top View (With Tray)

Page 2

4-2 DECK MECHANISM DISASSEMBLY 1.Holder Clamp (Fig. 4-1) 1)Release 2 Screws(S1). 2) Unhook 2 Locking Tabs(L1). 3) Lift up the Holder Clamp and then separate it from the Base Main. 1-1. Clamp Assembly Disc 1)Place the Clamp Assembly Disc as Fig. (A) 2)Lift up the Clamp Assembly Disc in direction of arrow(A). 3)Separate the Clamp Assembly Disc from the Holder Clamp. 1-1-1. Plate Clamp 1) Turn the Plate Clamp to counterclockwise direction and then lift up the Plate Clamp. 1-1-2. Magnet Clamp 1-1-3.Clamp Upper 2. Tray Disc (Fig. 4-2) 1)Insert and push a Driver in the emergency eject hole(A) at the right side, or put the Driver on the Lever(B) of the Gear Emergency and pull the Lever(B) in direction of arrow so that the Tray Disc is ejected about 15~20mm. 2)Pull the Tray Disc until it is separated from the Base Main completely. BASE MAIN HOLDER CLAMP HOLDER CLAMP CLAMP ASSEMBLY DISC HOLDER CLAMP PLATE CLAMP (S1) (S1)(A) (L1) (L1)(Fig. A) MAGNET CLAMPCLAMP UPPER (B) LEVER BOTTOM SIDE VIEW EMERGENCY EJECT HOLE (A) TRAY DISC BASE MAIN BASE MAIN Fig. 4-1Fig. 4-2